Skip to main content

The Government of Tonga secured funding from the World Bank for the Tonga Climate Resilient Transport Project (TCRTP II), to facilitate the safe, efficient, and sustainable...

The service consists of the Feasibility Study, Preliminary and Detailed Engineering Design and preparation of bidding documents. The consultancy services shall be executed in two...

The service consists of the Feasibility Study, Preliminary and Detailed Engineering Design and preparation of bidding documents. The consultancy services shall be executed in two...

The overall objective of the assignment was to carry out road safety audits at the design review stage (Stage 3 RSA of the design review). The purpose of the Road Safety Audit was...