Skip to main content
Projects By Category

Undertook an independent traffic study that will provide the most up-to-date traffic data and forecasts. The focus of the Traffic study should be the preparation of suitable macro...

Undertook the preliminary engineering study for capacity improvement of the Kibuye - Busega Road from the present two lane highway to dual-2 lane carriageway expressway. The Kibuye...

The Government of Tonga secured funding from the World Bank for the Tonga Climate Resilient Transport Project (TCRTP II), to facilitate the safe, efficient, and sustainable...

The service consists of the Feasibility Study, Preliminary and Detailed Engineering Design and preparation of bidding documents. The consultancy services shall be executed in two...

The service consists of the Feasibility Study, Preliminary and Detailed Engineering Design and preparation of bidding documents. The consultancy services shall be executed in two...

The overall objective of the assignment was to carry out road safety audits at the design review stage (Stage 3 RSA of the design review). The purpose of the Road Safety Audit was...

Undertook the assessment of traffic impact for the proposed commercial development on Yusuf Lule Road near Kampala city Centre. Assignment included review of proposed access routes...

Under the DRDIP‑Uganda Eraji Bridge project, the consultancy works encompassed conducting environmental and social impact assessments alongside a resettlement action plan...

The consultancy works for the Palorinya Bridge project were undertaken to deliver a safe and sustainable link between the settlement camp and Obongi through a structured two‑phase...

The main objective was to design and cost the road infrastructure network together with the associated earthworks and stormwater drainage; to provide NHCC with sufficient...